Tangent Projects
 
Refurbish and 
Fit-Out Overview 
About Tangent Projects 
Client List and Sample  Projects 
Contact Tangent 
Projects 
Contract Types and  Responsibilities 
CDM 
Education, Health and  Government 

Client List

33 Ltd
Aldersgate Investments
Archeus
Asset Services
AtisReal
Barclays Bank PLC
Bauhaus
Bayerische Landesbank
Beamray
BUPA
C5
Cairns & Associates
CCPL
Close Invoice Finance
Compco PLC
Conran
Daneline Ltd
Danescroft
Daws Investments Ltd
Dron & Wright

Dyson Ltd
Eros Properties
EuroMTS Ltd
Gargoyle Partners
Glorbrook
Gort Securities
GVA Grimley
Hargreaves
HIV Aids Alliance
Investco
IPS Pensionbuilder (Acumen) Ltd
Josiah Wedgwood & Sons Ltd
Kei Properties
Langley Byers
London Borough of Sutton
Managed Office Solutions
Mears Ash (Kingston Shaw)
MGM Mirage
MPC Investors

Net2S
Northridge Capital
Opta
Osprey Mott MacDonald
Panalbion
Redd Solicitors
Scottish Widows
Seaward
Semantico
STS Travel
Syncline
Trinitech
Triton Advisors (UK) Ltd
Vernon Smith
Wedgwood
Wedgwood
Welbeck Land
Winkworth

 

Sample Projects

  1. London E1
    Strip out and refurbish 3 reception areas, 31 WC facilities and multiple office locations, including bespoke joinery and concept designs as package of improvements to building purchased for active management.
    Client: Danescroft Ltd (Commercial landlord).

    London E1  London E1  London E1  London E1  London E1
    ........................................................................................................................................................................

  2. London EC2
    Fit-out of new Category A offices to high specification for tenant, including extensive negotiation with landlord, consultants and suppliers and installation of design-led interior. Works to base building services and lighting, with installation of specialist finishes and furniture. Approx 570 sq mtrs. Tangent Projects' directors have fitted-out and modified the client's previous offices.
    Repeat Client: EuroMTS Ltd (Bond marketing company).

    London EC2   London EC2   London EC2   London EC2   London EC2   London EC2
    ........................................................................................................................................................................

  3. Hastings, East Sussex
    Various contracts over 4 years, to substantially upgrade exterior envelope (including replacement windows, re-cladding, re-roofing), internal common parts (including new lighting and new lift interiors), services and office refurbishment throughout the building for re-letting.
    Repeat Client: IPS Pensionbuilder (Acumen) Ltd (Commercial landlord).

    Hastings, East Sussex  Hastings, East Sussex  Hastings, East Sussex  Hastings, East Sussex  
    ........................................................................................................................................................................

  4. London SW3
    Partial demolition and rebuild, with complete strip-out and reconfiguration of 3 storey building to provide consumer hardware marketing offices and showroom for Dyson Ltd. Project including removal of brick facade and installation of 30 sq mtr glass facade, creation of mezzanine floor, installation of full ducted air conditioning system, specialist joinery and finishes, concealed services and show flat, on design-and-build negotiated contract.
    Client: Dyson Ltd (Consumer hardware company).

    London SW3   London SW3   London SW3   London SW3   London SW3   London SW3 London SW3
    ........................................................................................................................................................................

  5. Brighton
    Fit-out and new offices for international division.
    Client: BUPA (Private Health Care Insurer).

    Brighton  Brighton  Brighton  Brighton 
    ........................................................................................................................................................................

  6. London WC2/SW3
    Fit-out and furnish new offices at two locations, furniture only at other location, for estate agency.
    Repeat Client: Winkworth (Estate agent franchisee).

    London WC2/SW3  London WC2/SW3  London WC2/SW3  London WC2/SW3
    ........................................................................................................................................................................

  7. London W1
    Strip-out and refit 480 sq mtr office floor for tenants, including partitions, carpet and furniture. Design-and-build project undertaken over 5 week on-site period. Repeat business including comprehensive revisions and furnishing at this location over 5 year period. Tangent Projects directors have undertaken three complete fit-outs for Triton as they have grown.
    Repeat Client: Triton Advisors (UK) Ltd (Fund manager).

    London W1  London W1  London W1
    ........................................................................................................................................................................

  8. Brighton
    Strip-out and refurbishment of 750 sq mtr office floor for client, in continuous occupation, including installation of new finishes, furniture, ceiling, lighting, and air conditioning; re-presentation and reconfiguration to allow 25% increase in occupancy.
    Repeat Client: Close Invoice Finance (Commercial debt factor).

    Brighton  Brighton  Brighton
    ........................................................................................................................................................................

  9. Brighton
    Complete strip-out and refurbishment of 975 sq mtrs offices above Prime banking hall for landlord, for re-letting following investment purchase. Included substantial works to common parts and project management of consultants.
    Repeat Client: Eros Properties (Commercial landlord).
    Client: Compco PLC. ( UK property company.)

    Brighton  Brighton  Brighton
    ........................................................................................................................................................................

  10. Brighton
    Various projects at this address over 5 year period, including refurbishment of common parts and various external works including new carpets, ceilings, lighting and colour scheme, replacement of flat roof membrane and insulation, new car park barrier and fencing, to upgrade and enhance the building's presence in time for rent reviews. Also refurbishment of various office floors and installation of air conditioning.
    Repeat Client: CCPL (Commercial landlord).

    Brighton  Brighton  Brighton  Brighton  
    ........................................................................................................................................................................

  11. London W4
    Fit-out of 180 sq mtr office floor for major US leisure / technology company's occupation. Works included partitioning, lighting, access and small power works to Tangent Projects' specification.
    Client: MGM Mirage. (US leisure operator).

    London W4  London W4  London W4

    ........................................................................................................................................................................

  12. London EC1
    Reconfigure and fit out second-hand offices for client's own occupation.
    Client: Redd (Solicitors).

    London EC1  London EC1  London EC1
    ........................................................................................................................................................................

  13. Reading
    Refurbishment of offices, common parts, apartments and various external works, including new air conditioning, services, raised access floor, carpets, ceilings, lighting, finishes and some roof works. Site period 14 weeks.
    Repeat Client: Daws Investments Ltd (Commercial landlord).

    Reading  Reading  Reading  Reading  Reading
    ........................................................................................................................................................................

Recent Project Locations

Brighton, East Sussex: 

139-142 North Street

Brighton: 

Lees House, Dyke Road

Hastings, East Sussex: 

Cavendish House, Breeds Place

Hove, East Sussex: Ridgeland House
London E1: 

110-114 Middlesex Street

London EC1: 

1-3 Dufferin Street

London EC1: 

29 Cloth Fair

London EC2: 

30 Old Broad Street

London EC2: 

Bavaria House, 13-14 Appold Street

London NW1: 

Primrose Studios, 109-111 Regents Park Road

London SW3: 

3-5 Ives Street

London W1: 

105 Piccadilly

London W1: 

116 Baker Street

London W1: 

30-32 Wigmore Street

London W4: 

Power Road Studios

London WC2: 

55 New Oxford Street

London WC2: 

Kean House, Kean Street

Lowfield Heath, Surrey: 

1a Gatwick Gate

Reading: 

59-60 St Mary's Butts

Segensworth, Hants: 

Unit 7, Little Park Farm Road

Sutton, Surrey:

23 Benhill Avenue

Swindon, Wilts: 6 Drakes Meadow
........................................................................................................................................................................
 
| Refurbish and Fit-Out Overview  |  About Tangent Projects   |  Client List and Sample Projects  |  Contact Tangent Projects  |   Contract Types and Responsibilities |  |  CDM  |  Education, Health and Government |
Site by Yadabyte Websites